fillin seal
Beechingless Barnstaple (2006/7..)
fillin seal

The 2006/7 Total Rebuild - LED Lighting of Storage Levels

IMG_2257.JPG - 44Kb

IMG_2259.JPG - 56Kb

IMG_2258.JPG - 48Kb

The 2% Incline (Woodlands Scenics) requires 10 metres to rise the 20cm between Storage and Scenic Levels



The Original Beechingless Barnstaple (1976)
Moving Adaptions - adjusting to the new (1979)
Beechingless Barnstaple (1976-2005)
Beechingless Barnstaple 2007 - The Total Rebuild
1 - Aluminium Framing and Polycarbonate bases
2 - Ilfracombe Construction - Fireproof Expanded Polystyrene Top Layer
3 - Track Laying in the Storage Area
4 - Blue Sky and Lower Level Lighting/ Scenic Level Early Days
5 - More Early Scenic Level Basics - including the change to a Viaduct
6 - Rocoline reaches Barnstaple Junction
The Simplicity of DCC Power Distribution
720 LED Lighting of Storage Level
7- Scenic Level Solid Foam Construction (May 2007)
8a - Video Monitoring of Storage Area
8b - Rocoline: Revised Ilfracombe Approach and Test Loops
8c - Rocoline: Revised Viaduct Branchline and Barnstaple East / Yard
8d - Rocoline: Revised Barnstaple Bridge, Pilton
9 - Rocomotion - the beginning

LGB
Scandinavian
Shunting Puxzzle - Bruksbanen - G Scale

Return to Home Page 
Christmas 1997  
Christmas 1998


Created in HTMLEdit Studio by Phil Spiegelhalter on 21st September 2006/ revised August 2007