LED Blue Sky Lighting and LED Lower Level Lighting
followed by
Scenic Level: Wrafton - Fremington - Town - Early Track Positioning
Suspension Bridge
to be replaced by
Double Track Viaduct
And continued here:
Phase 5
The Original Beechingless Barnstaple (1976)
Moving Adaptions - adjusting to the new (1979)
Beechingless Barnstaple (1976-2005)
Beechingless Barnstaple 2007 - The Total Rebuild
1 - Aluminium Framing and Polycarbonate bases
2 - Ilfracombe Construction - Fireproof Expanded Polystyrene Top Layer
3 - Track Laying in the Storage Area
4 - Blue Sky and Lower Level Lighting/ Scenic Level Early Days
5 - More Early Scenic Level Basics - including the change to a Viaduct
6 - Rocoline reaches Barnstaple Junction
The Simplicity of DCC Power Distribution
720 LED Lighting of Storage Level
7- Scenic Level Solid Foam Construction (May 2007)
8a - Video Monitoring of Storage Area
8b - Rocoline: Revised Ilfracombe Approach and Test Loops
8c - Rocoline: Revised Viaduct Branchline and Barnstaple East / Yard
8d - Rocoline: Revised Barnstaple Bridge, Pilton
9 - Rocomotion - the beginning
LGB
Scandinavian
Shunting Puxzzle - Bruksbanen - G Scale
Return to Home Page
Christmas 1997
Christmas 1998
Created in HTMLEdit Studio by Phil Spiegelhalter on 21st September 2006/ revised August 2007